Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 31, 2024     Pitot tube routing and new wing spar penetration - (3 hours)       Category: Avionics
Added a few tie downs to the flap motor tower to secure the motor wires. Marked the extra throttle plate to cut for possible cabin heat and parking brake brackets. I'll install the panel, sit in the fuselage and try a few possible locations before committing to installing the brackets. Researched the Vans website to determine wing spar penetration locations to add a new pass thru for the pitot and static lines to the backup EFIS. Found a drawing on the Vans website for acceptable hole locations. Measured and measured and measured some more to figure out the best location of the new holes. Marked, drilled, deburred and installed 5/8” snap bushings. Fed the tubes thru and called it a day.


 